Dubai Logistics Park Truck Gates
A private logistics park in Dubai needed to move hundreds of trucks through its gates every day without stopping. GateFlow supplied heavy-duty barrier gates for truck lanes, high-speed barriers for pre-approved vehicles, and LPR cameras integrated with the park's transport management system.

Challenges
Truck queues at the gate delayed loading and dispatch schedules
No automated record of truck entry and exit for billing and security
Manual gate staffing was costly around the clock
Standard barriers wore out quickly under heavy daily use
Models & Quantities
| Equipment | Quantity |
|---|---|
| Heavy-Duty Boom Barrier | 6 units |
| High-Speed Boom Barrier | 4 units |
| LPR Camera | 10 units |
| Ground Loop Detector | 12 units |
System Architecture
- 1
Trucks pre-register plate numbers in the park's TMS before arrival
- 2
LPR cameras at entry read the plate and open the high-speed barrier
- 3
Unexpected trucks route to heavy-duty lanes for manual approval
- 4
Entry and exit timestamps sync to the TMS in real time
- 5
Dock assignments update as trucks pass the gate
Installation & Delivery
- Surveyed 3 entry and 2 exit lanes and planned camera sightlines
- Poured reinforced foundations for heavy-duty barrier housings
- Installed LPR cameras, loop detectors and wiring in 2 weeks
- Configured software integration with the client's TMS
- Trained on-site security staff and provided remote support
Results
- Gate processing time cut from 3 minutes to under 30 seconds
- Zero-staff automated entry for pre-approved trucks
- Full audit trail of every truck movement for billing
- System running 24/7 for 2+ years with routine maintenance only
Products Used in This Project
Get a similar solution for your project
Contact us and our engineering team will provide selection, drawings and a factory-direct quote based on your site.
Contact sales team

