Logistics Park Gate System
Logistics parks process hundreds of trucks a day. Heavy-duty barriers and high-speed barriers move trucks through gates fast, LPR logs every vehicle, and scheduling integration cuts waiting time and improves dock utilization.
Problemas que Enfrenta Este Escenario
Truck queues at gates slow the whole supply chain
No accurate record of which truck entered when
Scheduling and gate access are disconnected
Gate hardware must survive constant heavy use
Equipos Usados en Esta Solución
Cómo se Conecta el Sistema
- 1
LPR reads truck plates and matches the pre-registered schedule
- 2
High-speed barrier opens for expected trucks without stopping
- 3
Heavy-duty barrier handles unexpected or manual-approval trucks
- 4
Fleet management software receives entry/exit timestamps
- 5
Dock assignment and occupancy update in real time
Qué Incluye el Proyecto
- Entry and exit lanes with heavy-duty barriers
- High-speed lanes for scheduled, pre-approved trucks
- LPR cameras with fleet whitelist management
- Integration with TMS / fleet scheduling software
- Loop detectors and safety sensors on all lanes
Qué Afecta al Presupuesto
- Number of gate lanes and daily truck volume
- High-speed vs heavy-duty barrier mix
- LPR and TMS integration scope
- Concrete works and site installation
¿Quiere verlo en funcionamiento?
Hemos entregado proyectos similares en más de 50 países. Contacte a nuestro equipo de ventas para obtener presupuesto, planos de ingeniería y guía de instalación.



