Logistics Park Gate System
Logistics parks process hundreds of trucks a day. Heavy-duty barriers and high-speed barriers move trucks through gates fast, LPR logs every vehicle, and scheduling integration cuts waiting time and improves dock utilization.
Problemas que Este Cenário Enfrenta
Truck queues at gates slow the whole supply chain
No accurate record of which truck entered when
Scheduling and gate access are disconnected
Gate hardware must survive constant heavy use
Equipamentos Usados Nesta Solução
Como o Sistema se Conecta
- 1
LPR reads truck plates and matches the pre-registered schedule
- 2
High-speed barrier opens for expected trucks without stopping
- 3
Heavy-duty barrier handles unexpected or manual-approval trucks
- 4
Fleet management software receives entry/exit timestamps
- 5
Dock assignment and occupancy update in real time
O que o Projeto Inclui
- Entry and exit lanes with heavy-duty barriers
- High-speed lanes for scheduled, pre-approved trucks
- LPR cameras with fleet whitelist management
- Integration with TMS / fleet scheduling software
- Loop detectors and safety sensors on all lanes
O que Afeta o Orçamento
- Number of gate lanes and daily truck volume
- High-speed vs heavy-duty barrier mix
- LPR and TMS integration scope
- Concrete works and site installation
Quer ver na prática?
Entregamos projetos semelhantes em mais de 50 países. Fale com nossa equipe de vendas para obter cotação, desenhos de engenharia e orientação de instalação.



