Прикладное решение

Logistics Park Gate System

Logistics parks process hundreds of trucks a day. Heavy-duty barriers and high-speed barriers move trucks through gates fast, LPR logs every vehicle, and scheduling integration cuts waiting time and improves dock utilization.

Частые задачи

Задачи этого сценария

Truck queues at gates slow the whole supply chain

No accurate record of which truck entered when

Scheduling and gate access are disconnected

Gate hardware must survive constant heavy use

Рекомендуемые товары

Оборудование в этом решении

Архитектура системы

Как система соединяется

  1. 1

    LPR reads truck plates and matches the pre-registered schedule

  2. 2

    High-speed barrier opens for expected trucks without stopping

  3. 3

    Heavy-duty barrier handles unexpected or manual-approval trucks

  4. 4

    Fleet management software receives entry/exit timestamps

  5. 5

    Dock assignment and occupancy update in real time

Чек-лист конфигурации

Что входит в проект

  • Entry and exit lanes with heavy-duty barriers
  • High-speed lanes for scheduled, pre-approved trucks
  • LPR cameras with fleet whitelist management
  • Integration with TMS / fleet scheduling software
  • Loop detectors and safety sensors on all lanes
Бюджетные соображения

Что влияет на стоимость

  • Number of gate lanes and daily truck volume
  • High-speed vs heavy-duty barrier mix
  • LPR and TMS integration scope
  • Concrete works and site installation
Похожий проект

Хотите увидеть реальный результат?

Мы реализовали аналогичные проекты в более чем 50 странах. Свяжитесь с нашим отделом продаж для расчёта, инженерных чертежей и рекомендаций по установке.