Application Solution

Logistics Park Gate System

Logistics parks process hundreds of trucks a day. Heavy-duty barriers and high-speed barriers move trucks through gates fast, LPR logs every vehicle, and scheduling integration cuts waiting time and improves dock utilization.

Common Challenges

Problems This Scenario Faces

Truck queues at gates slow the whole supply chain

No accurate record of which truck entered when

Scheduling and gate access are disconnected

Gate hardware must survive constant heavy use

Recommended Products

Equipment Used in This Solution

System Architecture

How the System Connects

  1. 1

    LPR reads truck plates and matches the pre-registered schedule

  2. 2

    High-speed barrier opens for expected trucks without stopping

  3. 3

    Heavy-duty barrier handles unexpected or manual-approval trucks

  4. 4

    Fleet management software receives entry/exit timestamps

  5. 5

    Dock assignment and occupancy update in real time

Configuration Checklist

What the Project Includes

  • Entry and exit lanes with heavy-duty barriers
  • High-speed lanes for scheduled, pre-approved trucks
  • LPR cameras with fleet whitelist management
  • Integration with TMS / fleet scheduling software
  • Loop detectors and safety sensors on all lanes
Budget Considerations

What Affects the Quote

  • Number of gate lanes and daily truck volume
  • High-speed vs heavy-duty barrier mix
  • LPR and TMS integration scope
  • Concrete works and site installation
Related Project Case

Want to see it deployed for real?

We have delivered similar projects in 50+ countries. Contact our sales team for a quote, engineering drawings and installation guidance.